P3D PrintMargin
3D PRINTING BUSINESS WORKSHOP

Three worked 3D print pricing examples

Trace batch production, custom design labour and a promotion through the numbers before quoting.

These fictional scenarios use one consistent currency and illustrate the same model. They are not completed customer orders or claims about earnings. Numbers are rounded for display; calculations use full precision.

Scenario 1: four small products on one plate

Use the homepage default: 120 g at $25/kg, 10% extra material, six printing hours, 120 W at $0.18/kWh, $0.25 machine cost/hour, 10% failed batches, 15 active minutes at $20/hour, four items and $0.75 fulfilment per item. With a 10% fee, $0.30 fixed fee and 30% margin, the suggested price is $6.12/item. Labour is already paid in cost; the roughly $1.83 profit is additional and before income tax.

ComponentPer successful batch
Material, power and machine before failure reserve$4.9296
Production after 10% failure adjustment$5.477333…
Labour$5.00
Total including four × $0.75 fulfilment$13.477333…

Scenario 2: a one-off part with design work

A 60 g part from the same $25/kg spool, no extra waste, two print hours, 120 W at $0.18/kWh, $0.25 machine allowance and zero assumed failures costs $2.0432 before labour. Add 30 active minutes at $20/hour and $1 packaging. Cost is $13.0432. With no percentage fee, a $0.30 fixed fee and 30% margin, price is $19.061714…, displayed as $19.06. If an additional hour of design is needed, add $20 to labour: the price rises to $47.633143…, or $47.63. Omitting design can dominate any error in filament cost.

Scenario 3: a proposed discount at a market price

At $15 price, $8 unit cost, a 10% selling fee and $0.30 fixed fee, contribution is $5.20. A 20% discount leaves $2.50. With $300 fixed overhead, monthly break-even rises from 58 units to 120 units. That discount may require more finishing time, packaging and sales effort than the shop can support. Check price impact and capacity before accepting it.

Turn an example into your own job card

Replace every assumed number with a measured or documented input. Save the slicer profile, the date and the quote assumptions. After the run, compare saleable units, active minutes and failed attempts. Use the variance to update the next estimate rather than treating a displayed price as a permanent rule.